This project delt with a gas station chain called Get-Go. We were responsible for power washing the building, sidewalks, and parking lot. We also had to repaint the columns that held the canopy above the pumps, as well as redo the parking lot striping. Some gas stations needed bathroom doors repainted as well as vents dusted. We had a crew of 4 people that were able to do 1-2 gas stations a day depending on size and scope of work.
This job was working for dollar tree installing new signage. We installed all of their new dollar tree plus signage as well as window banding. We also removed all signage pertaining to old prices. Crew size was one person.
This job was for Family dollar. We installed their balloon displays that are located behind the counter hanging from the ceiling.